BMZ Logo
GC Logo
Supported By Logo
Local Partner Logo
Implementation Partner Logo

GREEN PAKISTAN PROJECT

Pakistani Flag

Factory Sustainability Journey

FAAZ INTERNATIONAL logo

FAAZ INTERNATIONAL

PRGMEA
Lahore
Product Line
Motorcycle Safety Garments
Website
Visit Site

Sustainability Journey

Complete breakdown of verification stages

9 Stages
Apr
10
2025

Project Onboarding & Commitment

Success

Factory formally joins the Green Pakistan Project by submitting its application and confirms its willingness to participate and follow the structured sustainability improvement process in alignments with EU Green Deal, LkSG, and international due diligence principles.

Attachments
LOCKED
Application form Request Access
Apr
18
2025

Baseline & Declaration Submission

Success

The factory submits its Baseline & Declaration to present a clear picture of its current labour, environmental, and health & safety practices. This assessment captures key operational information, legal compliance, and existing management systems for the Green Pakistan Project Panel to evaluate present conditions and identify priority areas for improvement. By submitting the declaration, the factory confirms the accuracy of the information and shows its commitment to responsible and transparent operations.

Attachments
LOCKED
Baseline & Declaration form Request Access
Apr
19
2025

On-Site Verification & Advisory Visit

Success

A formal visit is conducted by Green Pakistan Advisory panel along with the association team to validate the baseline information submitted. During this visit, actual factory practices are reviewed, gaps are identified, and the team provides practical guidance on how to meet international sustainability expectations.

Attachments
LOCK
1st Factory VisitRestricted
1st Factory Visit photo 1
1st Factory Visit photo 2
1st Factory Visit photo 3
+2
Jul
29
2025

Digital Data Entry on Umbertine Platform

Success

The data including workforce details, safety conditions, environmental metrics, and production information is entered into the Umbertine software which works on SocialFair 2030 Approach. This helps to evaluate the standardized KPIs and forms the analytical basis for the factory’s Sustainability Report.

Attachments
LOCKED
Umbertine data submission Request Access
Jul
30
2025

Technical Data Review & Feedback Integration

Success

After the factory completed its initial data entry in the Umbertine platform, technical experts from German Importers Association, Fruit of Sustainability and the association team reviewed the submitted information. They identified gaps, inconsistencies, and areas requiring clarification, and provided precise feedback for correction. Based on this guidance, the factory’s data submission in Umbertine was reopened to allow revisions. The factory updated its entries accordingly to ensure accuracy and alignment before proceeding to the next stage.

Sep
25
2025

First Sustainability Report (Draft) Submission

Success

After completing data entry on the Umbertine platform, the factory prepares its first Sustainability Report (Draft). This draft report was shared with the Green Pakistan Advisory Panel for a detailed review. The objective of this review was to obtain expert feedback, validate the reported data and receive guidance for strengthening the report in line with international sustainability and due-diligence expectations.

Attachments
LOCKED
Sustainability report Draft 1 Request Access
Sep
26
2025

Revised Sustainability Report (Draft) Submission after Technical Feedback

Success

After receiving structured feedback from Green Pakistan Project Panel, the factory incorporates the feedback and submits the revised version. This step ensures accuracy, completeness, alignment with international frameworks and readiness for final verification.

Attachments
LOCKED
Sustainability report Draft 2 Request Access
Oct
4
2025

Assessment of Water Use, Treatment, and Recycling Practices

Success

The Green Pakistan Advisory Panel along with Dr. Achim, conducted a comprehensive site visit to evaluate unit-level water management at the factory covering abstraction, distribution, consumption, treatment and disposal stages. The assessment also reviewed existing and potential recycling and reuse practices, monitoring systems and treatment technologies. Following the visit, Dr. Achim shared a detailed set of technical recommendations focusing on water usage efficiency, scaling up recycling and the adoption of advanced water-saving technologies.

Dec
19
2025

Final Sustainability Report

Success

The final approved report showcases the factory’s sustainability performance, verified data, and improvement roadmap. This marks the completion of GPP’s reporting cycle and represents the factory’s official compliance achievement under the initiative.

Attachments
DOCX
Final Sustainability report Click to view